Generation matched to demand.
Generation is sized from the load it serves, not from the land available. The demand profile, its peaks and its tolerance for interruption decide the technology before any equipment is specified.
Generation matched to demand.
Load Assessment
Demand profile, peak, base load and growth measured or modelled before capacity is sized.
Grid-Connected Generation
Utility-scale generation where connection, permitting and offtake can be secured.
Distributed and Captive
On-site generation for industrial and institutional users where grid supply is constrained or unreliable.
Hybrid Systems
Combinations of generation and storage where a single source cannot meet the profile economically.
Operations and Maintenance
Long-term operation planned at design stage, since availability determines delivered cost.
- Location and site control
- Load or supply volume required
- Grid or offtake position
- Permitting status
- Fuel or resource availability
- Financing position
- Required date
Energy projects and supply are subject to technical feasibility, licences, permits, environmental requirements, sanctions, financing, contracting and market conditions. No project is represented as committed before formal approval.
Site, load, connection.
A project without those established is assessed as a concept.